Privacy Policy updated What changed: optional accounts to save calculations, and optional e-mails about new guides and tools

Labor rate calculator and pricing tools for trade businesses

Work out the hourly rate that covers your wages, overhead and profit — then price jobs, write estimates and size equipment with free tools. Calculators run in your browser and work without an account. Nothing is saved unless you press Save.

Your labor rate

Who does the billable work?

Example shop: 3 techs at the BLS median plumber wage, $120,000 overhead. Change any number or pick your state.

Charge at least Example shop

Charge at least $125.20 per billable hour; break-even $112.68.

Round up to $130 (+$4.80)

See it drawn to scale
Rate build-upDrawn to scale: every dollar the same height
Rate build-up for the example, drawn to scaleColumn from $0 to $125.20 per billable hour, drawn to scale: wage $52.43, taxes & benefits $13.64, overhead $32.87, truck $13.74, profit 10% $12.52. Break-even line at $112.68. Rounded up to $130.12345$0Labor$66.07Break-even$112.68Your rate$125.20Round up to$130
  1. Wage$63,793.60 ÷ 1,216.8 h$52.43
  2. Taxes & benefits26.02% of pay$13.64
  3. Overhead$120,000 ÷ 3,650.4 h$32.87
  4. Truck$16,719.14 ÷ 1,216.8 h$13.74
  5. Profit 10%of the price$12.52
Break-even
$112.68
Profit per hour
$12.52
Revenue a year
$457,033

$112.68 ÷ (1 − 10%) = $125.20rounded up to $130

Already showing the example.

Price your tasks at $130 an hourOpens the price book builder with this rate.

Billable hours
1,216.8per tech a year
Loaded wage
$38.65per paid hour
Labor
$66.07per billable hour
Overhead
$32.87per billable hour
Truck
$13.74per billable hour
Labor burden
26.02%over gross pay

What moves your rate

  • Every billable hour sold under $112.68 loses money.
  • At 70% billable instead of 65%, break-even drops to $104.63, $8.05 an hour less.
  • Cut $10,000 of overhead a year and break-even drops $2.74 an hour, to $109.94.
Show the math
  1. Worked hours2,080 h − 26 days × 8 h = 1,872 h
  2. Billable hours per tech1,872 h × 65% = 1,216.8 h
  3. Gross pay per tech$30.67 × 2,080 h = $63,793.60
  4. Employer taxes and comp$3,955.20 SS + $925.01 Medicare + $42.00 FUTA + $243.00 SUTA + $1,703.29 comp = $6,868.50
  5. Benefits$63,793.60 × 15.25% = $9,728.52
  6. Labor per billable hour$80,390.62 ÷ 1,216.8 h = $66.07
  7. Overhead per billable hour$120,000 ÷ (3 × 1,216.8 h) = $32.87
  8. Truck per billable hour$16,719.14 ÷ 1,216.8 h = $13.74
  9. Break-even$66.07 + $32.87 + $13.74 = $112.68
  10. Rate at 10% profit$112.68 ÷ (1 − 10%) = $125.20

Change the numbers

State and trade
Trade

Fills the wage and state unemployment tax (SUTA). Workers’ comp and everything else stay as they are.

Filled: the U.S. example3 figures
Wage Plumbing
$30.67/hr
U.S. median for plumbers · BLS OEWS May 2025
SUTA rate Example
2.70%
Example state: the Texas new-employer rate · DOL Significant Provisions, July 2026
SUTA wage base Example
$9,000
Example state: Texas · DOL Significant Provisions, July 2026

Your own rate notice wins. These are new-employer rates: after one to three years the state sets your own, and construction employers often pay a different rate.

See all 50 states and DC
Crew and pay

People who bill hours. Office staff go in overhead.

Average base pay. Example: BLS median for plumbers, May 2025.

Hours and time off2,080 h · 26 days off

40 hours × 52 weeks = 2,080.

Holidays, vacation and sick days, 8 h each. Example: 8 + 11 + 7 (BLS).

Optional. Paid at 1.5 × the wage. Leave 0 if none.

Billable time

Share of worked hours that ends up on invoices. Published figures run from 30% to 65%.

Billable hours1,216.8 hper tech · 3,650.4 h for the shop
Payroll taxes and benefits+26.02% of pay

Example state: the Texas new-employer rate. Use the rate on your state notice.

Pay per tech the state rate applies to. Example: Texas, $9,000.

Use the rate on your policy. Example: BLS construction average.

Health, retirement and other benefits. Example: BLS construction average.

Loaded wage$38.65per paid hour · burden 26.02%

Included automatically (IRS, tax year 2026): Social Security 6.2% of pay up to $184,500, Medicare 1.45%, federal unemployment (FUTA) 0.6% of the first $7,000.

Shop costs

An example figure. Everything except field pay and trucks — split it in the worksheet below.

Payments, fuel, insurance and upkeep. Enter 0 if trucks are already in overhead.

Profit

Profit as a share of the price, not a markup on cost.

Your rate: $125.20 per billable hour · break-even $112.68. Back to the result

Where your overhead goes

The calculator takes overhead as one number. Split it here into lines you can change — they always add up to the overhead above: $120,000 a year, or $32.87 of every billable hour.

Example split Example lines, not typical figures. Type your own.

Overhead lines per year and per billable hour, with each line’s share of total overhead
Overhead linePer yearPer billable hour
$4.93
$9.86
$2.74
$2.47
$1.64
$1.37
$1.64
$8.22
Total overhead$120,000$32.87

Bars show each line’s share of total overhead, to scale: a full bar is 100%. Per billable hour = per year ÷ 3,650.4 billable hours for the shop. Trucks have their own line in the calculator.

How the math works

Every hour a tech is paid for, billed or not, has to be paid for by the hours that are billed. So the calculator puts each cost on a per-billable-hour basis, adds them up to the break-even, then adds profit as a share of the price.

The full method, step by step

  1. Worked hourspaid hours − paid days off × 8 h
  2. Billable hoursworked hours × billable efficiencyThe 65% figure was measured as a share of paid time; applying it to worked hours, as this calculator does, gives fewer billable hours and a higher rate.
  3. Loaded labor costgross pay + Social Security + Medicare + FUTA + SUTA + workers’ comp + benefitsEach is figured on gross pay for all paid hours, so paid time off costs money but bills nothing.
  4. Break-even(loaded labor + truck) ÷ billable hours + overhead ÷ (techs × billable hours)Example shop: $66.07 + $32.87 + $13.74 = $112.68.
  5. Your ratebreak-even ÷ (1 − net profit %) = $125.20Profit is a share of the price, not a markup on cost: 10% of the price is an 11.11% markup on break-even.
  6. Round upto the next $5 step = $130The math keeps full precision and rounds only what it shows, so parts can differ from a total by a cent.
  7. Owner-operator(your pay + half of SE tax + benefits + overhead + truck) ÷ billable hoursExample: $113.29 break-even, $125.87 at 10% profit.
Where the example numbers come from15 figures, each sourced

Pick a state under State and trade and the calculator fills that state’s median wage for the trade and its unemployment-tax wage base and new-employer rate. Everything else stays at the national examples below. All 50 states and DC, side by side

Tech wage
$30.67 an hourBLS Occupational Employment and Wage Statistics, national median (SOC 47-2152), May 2025. Plumbers. HVAC: $29.33; electricians: $30.38. The state picker fills your state’s median for the trade (BLS OEWS state estimates, May 2025)
Paid hours
2,080 a yearSite arithmetic (40 hours × 52 weeks), 2026-10-04
Paid days off
8 holidays + 11 vacation + 7 sick daysBLS, The Economics Daily (private industry), 2025; BLS, paid leave by service requirement (private industry), March 2026. After 1 year of service
Billable efficiency
65%Field Promax data via ACHR News (software vendor), June 2026. Share of worked hours; other sources range from 30% to 65%
Social Security
6.2% of pay up to $184,500IRS Topic 751, Tax year 2026
Medicare
1.45%IRS Topic 751, Tax year 2026. No wage base limit
Federal unemployment (FUTA)
0.6% of the first $7,000IRS Topic 759, Tax year 2026. After the full 5.4% state credit
State unemployment (SUTA)
2.7% of the first $9,000U.S. Department of Labor, Significant Provisions of State UI Laws, Effective July 2026, Texas new-employer row (unchanged since January 2026). An example state. The state picker fills your state’s wage base and new-employer rate — the construction rate where the state publishes one
Workers’ comp
$2.67 per $100 of payBLS Employer Costs for Employee Compensation, construction industry (site arithmetic: 1.10 ÷ 41.25), June 2026. Per $100 of gross pay; use the rate on your policy
Benefits
15.25% of payBLS Employer Costs for Employee Compensation, construction industry (site arithmetic: (3.90 + 2.39) ÷ 41.25), June 2026
Truck cost
$16,719.14 a year per truckSite arithmetic: truck cost tool with the truck defaults above, Price for Monday, September 28, 2026. Set to 0 if trucks are already in your overhead
Target net profit
10% of the priceServiceTitan blog (software vendor), low end of "10–20% healthy", July 2026
Overhead
$120,000 a year (3 techs); $30,000 (owner-operator)Editorial example: no source gives a typical overhead for a small shop
Owner-operator pay
$85,113.60 a yearSite arithmetic: $40.92 × 2,080 h; BLS Occupational Employment and Wage Statistics, national median (SOC 47-2152), 75th percentile, May 2025
Self-employment tax
15.3% on 92.35% of pay; half is addedIRS Topic 554, Tax year 2026. 12.4% Social Security + 2.9% Medicare
Before you use the number9 caveats
  • Your numbers beat ours. Every example is a national average or an example: payroll records, the workers’ comp declarations page and your state unemployment notice give the real figures.
  • SUTA is a new-employer rate. After one to three years your state assigns your own rate, and construction employers often pay a different one — your rate notice wins over the picker.
  • Workers’ comp is not filled by state. It varies by state, class code, insurer and employer; the example stays a national construction average.
  • State medians cover every industry, union and non-union, and leave out the self-employed; pay in a metro area can differ from its state’s median by more than neighboring states do.
  • FUTA can be more than 0.6% in credit-reduction states: California employers paid 1.8% for 2025.
  • “Billable” is defined differently from source to source. Measure your own: hours invoiced ÷ hours worked over the last 12 months.
  • Count drive time once. If a trip charge bills it, treat it as billable here; if not, the rate has to carry it.
  • Owner-operator mode is a simplification: self-employment tax depends on the whole year’s earnings and any W-2 wages, and income tax is not included.
  • BLS averages include workers who get no benefit, so 15.25% is an average, not a quote for a health plan.
Sources10 sources, checked October 4, 2026

Sources

Opened and checked October 4, 2026. The worked example is our own arithmetic.

  1. Occupational Outlook Handbook: Plumbers, Pipefitters, and SteamfittersU.S. Bureau of Labor Statistics
  2. Employer Costs for Employee Compensation – June 2026U.S. Bureau of Labor Statistics
  3. Paid leave benefits: average sick and vacation days by length of serviceU.S. Bureau of Labor Statistics
  4. Topic no. 751, Social Security and Medicare withholding ratesInternal Revenue Service
  5. Topic no. 759, Form 940 — FUTA tax returnInternal Revenue Service
  6. Topic no. 554, Self-employment taxInternal Revenue Service
  7. Significant Provisions of State Unemployment Insurance Laws, Effective July 2026U.S. Department of Labor, Office of Unemployment Insurance
  8. Occupational Employment and Wage Statistics: May 2025 state estimatesU.S. Bureau of Labor Statistics (OEWS tables)
  9. Report: Only 65% of HVAC technician time is billable hoursACHR News (Field Promax data; a software vendor)
  10. HVAC profit marginsServiceTitan blog (a software vendor)

Every tool, by job

Free. Calculators run in your browser and work without an account. Nothing is saved unless you press Save. All tools, with what each one is for

Pricing 7 tools

Estimates & invoices 2 tools

Sizing 7 tools

Software 6 guides

Plain comparisons built from public pricing and documentation, dated.

Start here

Four in-depth guides behind every price you write, each with its sources and the date it was checked.

  • In-depth guideLength · 11 min

    How to Calculate Your Labor Rate, Step by Step

    Build an hourly labor rate from wage, labor burden, billable hours, overhead, truck cost and profit, with a fully worked three-tech shop example.

    $112.68 ÷ 0.90 = $125.20

  • In-depth guideLength · 11 min

    Markup vs Margin for Contractors: Formulas and Table

    Markup is on cost, margin is on price. Formulas, a conversion table, the classic mistakes and a water heater swap with labor, parts, tax and card fees.

    $100 + 50% = $150 → 33.3% margin

  • In-depth guideLength · 10 min

    What Your Service Truck Costs per Billable Hour

    Work out a service truck's cost per mile and per billable hour from ownership and operating costs, using AAA 2026 data, with the IRS rate as a check.

    $16,719.14 ÷ 1,216.8 h = $13.74

  • In-depth guideLength · 11 min

    Flat Rate vs Time and Materials: The Break-Even Math

    How flat-rate and time-and-materials prices are built, one job priced both ways, where a flat price stops paying, and how to switch one task over.

    1.5 h × $125.20 = $187.80 + parts

About this site

A shop workbench with copper pipe and brass fittings in steel buckets, a pipe wrench and a hard hat against a white wall

Trade Price Book is run by people who operate a plumbing and sewer business in the United States.

Calculators run in your browser and work without an account. Nothing is saved unless you press Save. Every guide lists its sources and the date it was checked. Ads and labelled affiliate links pay for the site.