Your supply house still has R-410A condensers on the shelf, a customer wants the cheaper system, and a competitor says the ban is over. Meanwhile a tech asks whether swapping just the outdoor unit counts as a new install. EPA's May 2026 rule settled part of this and left the rest exactly as it was.
This guide sticks to what the rule text and EPA's own pages say, with dates, then turns it into questions for your distributor and lines for your estimate.
What the 2026 rule changed, with dates
The rule is titled Phasedown of Hydrofluorocarbons: Reconsideration of Certain Regulatory Requirements Promulgated Under the Technology Transitions Provisions of the AIM Act, published in the Federal Register at 91 FR 31284. For residential and light commercial air conditioners and heat pumps, the change that matters is this: it removed the deadline for installing systems whose components were made in or imported into the U.S. before January 1, 2025.
| Date | What happened | Source |
|---|---|---|
| October 24, 2023 | Original Technology Transitions rule: new residential and light commercial AC and heat pump systems using refrigerant with a GWP of 700 or more can't be installed from January 1, 2025 | 88 FR 73098, as summarized in 91 FR 31284 |
| December 26, 2023 | Interim rule: systems whose components were made or imported before January 1, 2025 may still be installed until January 1, 2026 | 88 FR 88825 |
| October 3, 2025 | EPA proposes removing that January 1, 2026 deadline | 90 FR 47999 |
| May 26, 2026 | Final rule published | 91 FR 31284 |
| July 27, 2026 | Final rule takes effect | 91 FR 31284 |
The amended regulation, 40 CFR 84.54(c)(1), now says a new system using refrigerant at or above 700 GWP may still be installed where all specified components of that system were manufactured or imported before January 1, 2025. Specified components are condensing units, condensers, compressors, evaporator units and evaporators. EPA's GWP reference table lists R-410A at 2,088, R-454B at 465 and HFC-32 (R-32) at 675.
What did not change:
- The 700 limit itself. EPA says installing new R-410A systems with equipment made or imported after January 1, 2025 remains prohibited.
- Equipment made in Canada or Mexico before 2025 but imported after January 1, 2025 doesn't qualify, per EPA's response to comments.
- The treatment of replacement condensing units. EPA left those rules as they were.
- Variable refrigerant flow systems, which have their own dates: equipment made or imported before January 1, 2026 may be installed until January 1, 2027, or until January 1, 2028 for projects with a building permit issued before October 5, 2023 (EPA).
One caution: some answers on EPA's Frequent Questions page (last updated September 14, 2026, when we read it on October 4, 2026) still describe the old January 1, 2026 cutoff for new split systems. The amended regulation text above is what changed; when the two disagree, go by the rule and ask EPA.
Job by job: repair or new system?
The whole question turns on whether the job is a repair of an existing system or the installation of a new one.
| Job | Under the federal rule | Basis |
|---|---|---|
| Replace a failed R-410A condensing unit on an existing system, same capacity | Repair, allowed | EPA FAQ; 91 FR 31284 |
| Replace the condensing unit and indoor coil together, keeping the line set | New system | EPA FAQ |
| Replace the indoor coil on a system whose condensing unit was already replaced, or the reverse | EPA's 2026 preamble says this counts as a new system; its FAQ still says systems may be repaired over time, so ask EPA before quoting it | 91 FR 31284 (preamble, section IV.F); EPA FAQ |
| New home or addition | New system | EPA FAQ |
| Increase the cooling capacity of an existing system | Counts as installing a new system | 40 CFR 84.54(e)(2) |
| R-22 system: replace only the outdoor unit with R-410A | Not allowed; whole system must be replaced, which is a new system | EPA FAQ |
| R-410A system: put an R-32 or R-454B outdoor unit on it | Not addressed by the Technology Transitions rule; EPA notes SNAP and industry standards bar flammable or mildly flammable refrigerants in systems not designed for them | EPA FAQ |
A new system may use R-410A only if every specified component is pre-2025 U.S. stock. Otherwise it needs refrigerant under 700 GWP.
For repairs, R-410A condensing units and coils can still be manufactured, imported and sold. Units made or imported after January 1, 2025 must carry a permanent label reading "For servicing existing equipment only" (40 CFR 84.58(b)). Pre-2025 inventory doesn't need relabeling, EPA says.
The capacity point is easy to miss on a replacement. If a tech wants to go up a size on the outdoor unit, the regulation treats the capacity increase as a new installation, so the new-system rules apply.
The New York exception
New York regulates HFCs under its own rule, 6 NYCRR Part 494, amended effective January 9, 2025. DEC's Part 494 fact sheet sets a 700 GWP limit for residential and light commercial AC and heat pumps (including residential dehumidifiers), with a New York prohibition date of January 1, 2026.
DEC's Part 494 FAQ, updated May 2026, says Part 494 adopts federal rules only as they stood on its effective date. Later federal changes, extensions, no-action assurances and other EPA decisions are not carried over automatically; you have to go to DEC, for example with a variance application under 494-1.8. So unless an exemption or variance applies, EPA's pre-2025 inventory allowance does not make a new R-410A system installable in New York after January 1, 2026.
Other points from the DEC FAQ:
- A building permit issued before January 9, 2025 that specifies the refrigerant extends the 2025 and 2026 prohibitions by one year to finish that project (494-1.5).
- Using and servicing a legally installed system isn't prohibited, but retrofits, capacity increases and component replacements can make equipment count as new.
- From 2030, DEC prohibits buying and selling bulk containers of virgin refrigerant with a GWP above 1,500, and lists R-410A as an example. The container rule doesn't apply to servicing equipment, though servicers may buy or sell virgin bulk refrigerant only as part of a service repair.
Other states can have their own HFC rules. Check with your state environmental agency before quoting a pre-2025 R-410A system outside the federal baseline.
What to ask your distributor
- What are the manufacture dates, or U.S. import dates, of the condensing unit and the matching coil or air handler? Get them in writing, by serial number.
- Was this equipment in U.S. inventory before January 1, 2025, or imported later from Canada or Mexico?
- Does either component carry the label for servicing existing equipment only? If so, it is repair stock, not a new-system component.
- How does the manufacturer handle warranty registration and coverage for pre-2025 units installed now?
- What does R-410A refrigerant cost today, and what supply do you expect? The AIM Act caps total U.S. HFC production and consumption at 60% of baseline for 2024–2028, 30% for 2029–2033, 20% for 2034–2035 and 15% from 2036 on (42 U.S.C. 7675). Those caps cover all HFCs together, not R-410A alone.
- What R-454B or R-32 equipment and refrigerant can you supply for the same job? EPA's preamble notes R-454B was hard to get in service cylinders in some regions in 2025.
EPA's FAQ says the company that installs, or directs the installation of, a system is generally the responsible party. That's you, so the paper trail belongs in your job file, not just the distributor's.
How to quote it
- Name the job type on the estimate. Repair: replacement condensing unit on existing R-410A system reads very differently from New system: R-410A, all components manufactured or imported before January 1, 2025, and each tells the customer and any inspector what rule you relied on.
- List the component dates or serials for any pre-2025 new system, and attach the distributor's confirmation.
- Offer the A2L system alongside whenever a whole system is going in, so the customer chooses with both prices in front of them.
- Keep the expiry short. EPA describes the qualifying stock as finite and decreasing, and the exact unit you quoted may be gone next week.
- Price it the same way as any job: labor hours at your shop's rate plus equipment and parts at your markup. The flat-rate price calculator and markup vs margin guide cover the math; price the refrigerant charge at today's replacement cost, not last year's invoice.
- Use a written estimate with scope and exclusions. Our estimate checklist applies to HVAC jobs as well.
This is general information, not legal advice. For a specific job, ask EPA through the Contact Us About Reducing HFCs form on its HFC pages, or in New York ask DEC at climate.regs@dec.ny.gov.
Bottom line
Under the federal rule, and outside New York, pre-2025 R-410A inventory can be installed as a new system with no end date, as long as every major component is pre-2025 U.S. stock and you can show it. Condensing-unit repairs on existing R-410A systems were never banned and still aren't. Everything else that counts as a new system, including a capacity increase, needs refrigerant under 700 GWP. Check your own state's rules, write down which case each job is, and price it from your own numbers.
Sources
- Phasedown of Hydrofluorocarbons: Reconsideration of Certain Regulatory Requirements Promulgated Under the Technology Transitions Provisions of the American Innovation and Manufacturing Act of 2020 (91 FR 31284, May 26, 2026)
- 40 CFR 84.54 -- Restrictions on the use of hydrofluorocarbons
- Frequent Questions on the Phasedown of Hydrofluorocarbons
- Regulatory Actions for Technology Transitions
- Technology Transitions GWP Reference Table
- Frequently Asked Questions, Part 494 (Updated May 2026)
- Part 494 Fact Sheet
- 42 U.S. Code § 7675 - American innovation and manufacturing
Tools for the job
Tool listHVAC4 itemsSpecs read
As an Amazon Associate, Trade Price Book earns from qualifying purchases. Amazon links are marked “(paid link)”; prices aren’t shown here.
Digital manifolds and probesFieldpiece SM482V
SM482V SMAN Wireless Refrigerant Manifold (4-Port)
- 4-valve digital manifold with integrated vacuum gauge and a 3/8 in. vacuum port; supports over 70 refrigerants and is A2L compatible.
Specs: Fieldpiece product page, read
View on Amazon for Fieldpiece SM482V(paid link)
Vacuum pumps and micron gaugesFieldpiece VP87
VP87 8 CFM Vacuum Pump
- 8 CFM two-stage rotary-vane pump with a 3/4 HP brushless DC motor; ultimate vacuum 15 microns.
Specs: Fieldpiece product page, read
View on Amazon for Fieldpiece VP87(paid link)
Recovery machines and scalesFieldpiece MR45
MR45 Digital Recovery Machine
- Oil-less twin-cylinder compressor with a 1 HP variable-speed DC motor; runs on 95 to 130 VAC.
Specs: Fieldpiece product page, read
View on Amazon for Fieldpiece MR45(paid link)
Flaring and swaging toolsNAVAC NEF6LM
BreakFree Power Flaring Tool NEF6LM
- Cordless flaring tool for copper tube in 1/4, 3/8, 1/2, 5/8 and 3/4 in. OD.
Specs: NAVAC product page, read
View on Amazon for NAVAC NEF6LM(paid link)
Newsletter
At most one e-mail a day, only about new guides and tools. No tracking pixels. How we handle your address